Bathroom Remodeling in Georgetown TX services we handle start to finish

One crew handles demolition, framing, plumbing rough-in, waterproofing, tile, electrical trim, and paint, so you are not chasing five subcontractors across three weeks. Whether you need a full gut in Berry Creek or a quick tub swap in Chandler Creek, we quote the whole job up front. Ask about Bathroom Remodeling in Georgetown TX near me scheduling and we will tell you honestly how soon we can start.

Bathroom Remodeling in Georgetown TX services we handle start to finish

One crew handles demolition, framing, plumbing rough-in, waterproofing, tile, electrical trim, and paint, so you are not chasing five subcontractors across three weeks. Whether you need a full gut in Berry Creek or a quick tub swap in Chandler Creek, we quote the whole job up front. Ask about Bathroom Remodeling in Georgetown TX near me scheduling and we will tell you honestly how soon we can start.

Full Bathroom Remodeling

A full gut takes a Georgetown hall bath down to the studs and back: new PEX piping, cement backer board, a Schluter waterproofing membrane, tile, vanity, toilet, and lighting. Most full remodels run three to five weeks on site. Best for homes with cracked tile, soft floors, or a layout that wastes space.

Bathroom Renovation

A renovation keeps the layout you already have and upgrades the surfaces: new porcelain tile, a quartz countertop, fresh grout, paint, and modern fixtures. It costs less than a full remodel and usually finishes in two to three weeks. Good fit for Sun City Georgetown homes that are structurally sound but dated.

Shower Remodeling

We rebuild showers with a sloped pan, proper weep holes, and a waterproofing membrane behind the tile so water never reaches the framing. Curbless and low-curb options work well for aging-in-place clients. A shower-only rebuild typically takes seven to ten working days.

Bathtub Remodeling

Tub remodels cover refinishing, replacement, and surround rebuilds. We set American Standard and Kohler tubs on a level bed of mortar so they do not flex and crack the caulk line. If your tub is the only one in the house, we schedule the swap so you are never without a working drain overnight.

Walk-In Tub Installation

Walk-in tubs need a framed opening, a dedicated drain, and often a wider doorway. We install them with grab bars and a handheld shower head, and we check the subfloor can carry the filled weight. Popular with Sun City Georgetown residents who want to stay in their own home.

Tile Installation

We set ceramic tile and porcelain tile with a wet saw, tile spacers, and a grout float, then seal the grout after it cures. Floors get a level check first; walls get backer board, never drywall. Straight grout lines and flush corners are the standard, not the upsell.

Vanity Installation

Vanity swaps include shutting off and reconnecting the supply lines, cutting the drain to height, and leveling the cabinet against the wall. We install quartz countertop or granite countertop tops with an undermount sink and a Moen or Delta faucet. Most single-vanity installs finish in one day.

Bathroom Flooring Installation

Bathroom floors get a moisture meter check before anything goes down. If the subfloor reads high, we fix the leak first. Then we lay porcelain tile, luxury vinyl, or sheet flooring over a properly prepped base. Tile floors in Georgetown homes usually take two to three days including grout cure.

Bathroom Countertop Installation

We template, cut, and set quartz or granite tops with the sink and faucet holes drilled in the shop. Undermount sinks get silicone caulk and clip support so they never drop. Turnaround is typically five to seven days from template to installed top.

Toilet Installation

Toilet installs cover the flange, the wax ring, the supply line, and hauling the old unit away. We check the flange height and replace it if it is cracked or below the finished floor. A standard swap takes about two hours, and we test flush three times before we leave.

Sink Installation

We install undermount, drop-in, and pedestal sinks with new PVC drain pipe and shutoff valves. Pedestal sinks in Old Town Georgetown homes often need the drain rerouted to fit the base. Every sink gets a leak check under full pressure before we call it done.

Faucet Installation

Faucet work covers kitchen-style pull-downs, widespread bathroom sets, and single-hole models from Moen, Delta, and Kohler. We replace the supply lines and angle stops while we are under there. A leaking faucet swap is usually a one-hour visit.

Shower Door Installation

Frameless and semi-frameless shower glass gets measured after tile is set, not before, so the panels fit the finished opening. We drill through tile with a hole saw and seal the edges with silicone caulk. Lead time on custom glass runs about two weeks.

Bathtub-to-Shower Conversion

Converting a tub to a shower opens up floor space and makes the room easier to enter. We remove the tub, cap or reroute the drain, build a sloped pan, and tile the walls. Most conversions finish in eight to twelve working days.

Accessible Bathroom Remodeling

Accessible remodels add grab bars, a curbless shower, a comfort-height toilet, and a wider clear floor space that meets ADA compliance dimensions. We reinforce blocking in the walls before tile so bars can be added later anywhere. Good for multi-generational households.

Bathroom Cabinets and Storage

We build and hang vanity cabinet runs, linen towers, and recessed medicine storage. In smaller Georgetown bathrooms, a shallow-depth cabinet beside the toilet adds real storage without blocking the door swing. Soft-close hinges and plywood boxes, not particle board.

Bathroom Ventilation and Exhaust Fan Installation

An exhaust fan not removing steam leads to mold and mildew on the ceiling and grout. We size the fan to the room, run a rigid exhaust fan duct to the outside, and terminate it with a proper roof or wall cap. Broan and Panasonic units are our usual picks.

Bathroom Waterproofing

Waterproofing is the part you never see and the part that matters most. We install cement backer board, seal the seams, and roll on a waterproofing membrane behind every wet wall and pan. Skipping this step is why so many showers leak within five years.

Bathroom Drywall and Painting

We hang greenboard in wet zones and standard drywall elsewhere, then tape, float, and sand smooth. Paint goes on after tile and trim so the cut lines stay clean. Moisture-resistant bathroom paint on the ceiling helps stop peeling above the shower.

Ready to start Bathroom Remodeling Georgetown TX?

One walkthrough, one written price, and a crew that has been finishing Georgetown bathrooms since 2013. Call 512 325 0295 or send us your address and we will get you on the schedule.

500+
Happy Clients
98%
Satisfaction Rate
24/7
Support Available