Bathroom Waterproofing Georgetown TX that stops leaks before tile goes down

Shower waterproofing in Georgetown TX built to TCNA standards

Bathroom Waterproofing Georgetown TX is the hidden layer that keeps water inside your shower instead of inside your walls. We install bonded and sheet membranes over cement backer board, flood-test every pan, and document the work before a single tile is set. If you are remodeling a bathroom in Williamson County or just tired of a ceiling stain under the upstairs bath, our team handles the waterproofing from demo to drain.

A clean, modern corner shower enclosure with glass doors in a tiled bathroom setting.

Bathroom Waterproofing Georgetown TX: What It Actually Involves

Bathroom Waterproofing Georgetown TX is the trade of sealing every wet surface in a bathroom, shower pan, walls, niches, bench seats, curbs, and the floor-to-wall transitions, with a continuous membrane that water cannot pass through. We start by removing old tile and greenboard, then inspect the framing and subfloor for rot. From there we set cement backer board, pack or set a sloped shower pan, and roll on a liquid-applied membrane or bond a sheet membrane like Schluter Kerdi. Every seam gets membrane banding, every screw head gets sealed, and the whole assembly gets a 24-hour flood test before tile touches it.

Georgetown homes deal with two things that punish a bad waterproofing job: expansive clay soil that shifts foundations, and summer humidity that pushes indoor moisture past 60 percent. A shower that was sealed with mastic and drywall in 2005 is already failing by 2026. We see it constantly in Sun City Georgetown and Berry Creek, where original builder-grade showers are hitting the 15 to 20 year mark. If you are searching for bathroom waterproofing near me Georgetown, the honest answer is that the cheapest quote usually skips the flood test and the pan slope, and you pay for that in water damage two years later.

Why Waterproofing Pays for Itself

Why Waterproofing Pays for Itself

Waterproofing is the one part of a bathroom you never see and always regret skipping. Here is what a proper membrane system actually buys you in a Georgetown home.

Stops Hidden Water Damage

A failed shower pan leaks 5 to 20 gallons a week into the subfloor before you notice. By the time a stain shows on the ceiling below, you are looking at $2,500 to $6,000 in framing, drywall, and flooring repair. A TCNA-compliant membrane and a 24-hour flood test catch that failure in the pan, not in your living room.

Blocks Mold and Mildew

Mold needs three things: moisture, organic material, and darkness. Greenboard and mastic give it all three. We replace both with cement backer board and an inorganic membrane, so the wall cavity behind your tile stays dry. Georgetown's humid summers make this the difference between a bathroom that smells clean and one that smells like a wet basement.

Protects Your Tile Investment

Tile and grout are not waterproof, they are water-resistant. When the membrane under them fails, movement and moisture crack grout lines and pop tiles loose. Waterproofing first means the $4,000 to $9,000 you spend on porcelain tile and installation actually lasts the 20-plus years it should.

Passes Inspection and Adds Value

Williamson County inspectors and most buyers' home inspectors look hard at shower pans. A documented waterproofing system with flood-test photos is proof the work was done right. That paperwork matters at resale, and it is why affordable bathroom waterproofing Georgetown TX done properly is never the cheapest line item on the bid.

Our Waterproofing Process, Step by Step

Every job follows the same sequence, whether it is a single shower or a full wet-room build. Here is exactly what happens from the first walkthrough to the day we hand you a dry, tested bathroom.

1

Assessment and Demo

We pull the old tile, backer board, and pan, usually one to two days for a standard 60-inch tub-to-shower conversion. You see the framing and subfloor for the first time. We check for rot with a moisture meter, note any soft spots, and photograph everything so you know what we found before we rebuild.

2

Framing and Subfloor Repair

Rotted studs, a spongy subfloor, or a cracked PVC drain pipe get fixed now, not later. We sister in new framing, replace damaged subfloor panels, and re-level the shower area. Skipping this step is the number one reason waterproofing fails, so we do not move forward until the structure is sound.

3

Backer Board and Pan Build

We hang cement backer board on the walls, set a pre-sloped pan or pack a mortar bed with a 1/4-inch-per-foot slope to the drain, and install the curb. Niche boxes, bench seats, and grab bar blocking go in at this stage. This is the two to three day stretch where the shower actually takes its shape.

4

Membrane and Flood Test

We apply the waterproofing membrane, liquid or sheet, with banding at every corner, seam, and penetration. Then we fill the pan with water and let it sit 24 hours. If the level drops, we find the leak and fix it before tile. You get photos of the flood test for your records.

5

Tile, Grout, and Final Seal

Only after a passing flood test do we set tile with a wet saw and tile spacers, grout the joints, and seal with silicone caulk at all changes of plane. Final walkthrough covers the exhaust fan, shower glass, and drain flow. Most full showers wrap in seven to twelve working days.

13 Years of Wet-Area Experience in Georgetown

Georgetown Bath Remodel Pros has been waterproofing bathrooms in Williamson County since 2013, which puts us at 13 years and well over 900 wet-area projects across Georgetown and the surrounding communities. Our lead installers hold TDLR contractor licensing and EPA Lead-Safe Certification for pre-1978 homes, and we build every shower to TCNA handbook standards and current IRC plumbing code. We have torn out enough failed pans to know what shortcuts look like, and we do not take them. Whether it is a Schluter Kerdi sheet system or a liquid-applied membrane, we install it the way the manufacturer specifies and we document it.

  • 13 years waterproofing Georgetown bathrooms, from 2013 to 2026
  • TDLR contractor license and EPA Lead-Safe Certification on every crew
  • TCNA-standard shower pan construction with 1/4-inch-per-foot slope
  • 24-hour flood test on every pan, with photo documentation for your records
  • Experienced with Schluter Kerdi, liquid membranes, and cement backer board systems
  • Full-service plumbing coordination under Texas State Board of Plumbing Examiners license
13 Years of Wet-Area Experience in Georgetown

Why Georgetown Homeowners Choose Our Waterproofing

Plenty of contractors will tile a shower. Far fewer will build the waterproofing system underneath it correctly and prove it with a flood test. That difference is the whole job.

Flood Test on Every Job

We fill every shower pan with water and let it sit a full 24 hours before tile goes down. If it leaks, we fix it on our dime, not yours. Most competitors skip this step entirely because it costs them a day. We consider it non-negotiable.

13 Years, 900+ Wet Areas

Since 2013 we have waterproofed showers, tub surrounds, and full wet rooms across Georgetown. That volume means we have seen every failure mode, from cracked pans in Sun City to mastic-and-drywall showers in Old Town Georgetown, and we know how to avoid them.

Manufacturer-Spec Installation

Schluter, Daltile, and MSI all publish installation requirements, and we follow them to the letter. That is what keeps your material warranty valid and your shower waterproofing Georgetown TX reliable for the long haul. Deviating from spec voids coverage, and we will not do it.

Local, Licensed, and Accountable

We are based in Georgetown, licensed through TDLR, and covered for lead-safe work in older homes. When you search bathroom waterproofing in Georgetown TX near me, you want a crew that will still be here in five years if something needs attention. We will be.

What Our Bathroom Waterproofing Service Includes

Every waterproofing job we do in Georgetown covers the full wet-area system, not just a coating on the walls. Here is what is included in a standard scope, and what we treat as an add-on when your project needs it.

What's Included

Full Demo and Inspection

We remove old tile, backer board, and pan, then inspect the framing and subfloor with a moisture meter. You get photos of what we find before we rebuild. This step usually takes one to two days for a standard shower.

Cement Backer Board Installation

We hang cement backer board on all wet walls, set with corrosion-resistant screws, and tape and mud the seams. No greenboard, no drywall in the wet zone. This is the substrate the membrane bonds to, and it has to be flat and secure.

Sloped Shower Pan and Curb

We build or set a pre-sloped pan with a 1/4-inch-per-foot slope to the drain, then install the curb and tie the pan into the wall membrane. Proper slope is what moves water to the drain instead of letting it pool and seep.

Membrane and Seam Banding

We apply the waterproofing membrane over the entire wet area, with banding at every corner, seam, screw penetration, niche, and curb. This is the layer that actually stops water. We use Schluter Kerdi sheet membrane or a liquid-applied system depending on your shower.

24-Hour Flood Test

We fill the pan with water and let it sit a full 24 hours before tile. If the level drops, we find and fix the leak. You get photos of the test for your records. This is the step most contractors skip, and it is the one that catches problems early.

Drain and Plumbing Coordination

We set the drain to the correct height for your tile, connect the PVC drain pipe, and coordinate any PEX piping changes with our licensed plumber. All plumbing work is done under Texas State Board of Plumbing Examiners license.

Waterproofing Problems We Solve in Georgetown

Most waterproofing failures look the same on the surface and very different once we open the wall. Here are the problems we run into most often in Georgetown bathrooms and how we fix them.

Problem

Shower pan leaking into the ceiling below

Water stains, sagging drywall, and eventually rot in the floor framing. A slow pan leak can run for months before it shows, and by then the repair is five figures.

Solution

We tear out the failed pan, repair any rotted framing or subfloor, rebuild the pan with a proper slope, apply a new membrane, and flood-test it for 24 hours. You get a dry ceiling and a documented, tested pan.

Problem

Mold and mildew behind tile and grout

Musty smells, dark staining in grout lines, and potential health issues for family members with allergies or asthma. Mold in a wall cavity spreads faster than most people realize.

Solution

We remove the affected tile and backer board, treat the framing, and rebuild with cement backer board and an inorganic membrane. No organic material means no food source for mold, even in Georgetown's humid summers.

Problem

Cracked tile and failing grout in the shower

Cracks let water straight through to the substrate. Once the backer board is wet, it swells, the tile pops loose, and the whole shower has to come out.

Solution

We replace the cracked tile, but more importantly we check the membrane underneath. If the waterproofing has failed, we rebuild the wet area from the studs out so the new tile has a stable, dry substrate.

Problem

Exhaust fan not removing steam

Steam condenses on walls and ceilings, raising indoor humidity and stressing the waterproofing. Over time, that moisture finds its way into the wall cavity and causes damage from the inside.

Solution

We size the exhaust fan to the room volume, duct it to the exterior, and make sure the waterproofing is intact. A Broan or Panasonic fan moving the right CFM keeps humidity under control and protects the membrane.

Problem

Water damage from an old tub-to-shower conversion

Conversions done without a proper pan or membrane leak at the curb and the drain. The damage often spreads to the adjacent room or the floor below before anyone notices.

Solution

We redo the conversion correctly: new sloped pan, new membrane, new curb, flood test, then tile. If there is existing water damage, we repair the framing and subfloor first so the new shower starts on solid ground.

When Georgetown Homeowners Need Waterproofing

1

You are remodeling a bathroom in a 1990s Georgetown home and the original shower is still in place.

Solution:

We tear out the old shower, inspect for hidden water damage, and rebuild the wet area with a modern membrane system before installing new tile. This is the ideal time to waterproof, because the walls are already open.

Outcome:

A new bathroom with a waterproofed shower that will last 20-plus years, plus peace of mind that any hidden damage was found and fixed.

2

You have a ceiling stain under an upstairs bathroom and are not sure where the leak is coming from.

Solution:

We open the shower pan and walls, run a flood test to locate the failure, and rebuild the waterproofing system. If the leak is from a plumbing connection, we coordinate with our licensed plumber to fix it.

Outcome:

The leak is found and fixed at the source, the ceiling is repaired, and the shower is rebuilt with a tested membrane so it does not happen again.

3

You are converting a bathtub to a walk-in shower in a Sun City Georgetown home.

Solution:

We remove the tub, build a sloped shower pan, waterproof the walls and floor, flood-test, then tile. We also check the exhaust fan and upgrade it if it is undersized for the new open shower.

Outcome:

A walk-in shower that is easier to use, properly waterproofed, and ventilated so moisture does not build up.

4

You are building an accessible bathroom with a curbless shower for a family member.

Solution:

Curbless showers need extra waterproofing because water has more paths to escape. We build the pan to ADA-compliant slopes, waterproof the entire wet zone including the floor transition, and flood-test before tile.

Outcome:

A safe, accessible shower that is fully waterproofed and code-compliant, with no step to trip on and no hidden leaks.

5

You are selling your Georgetown home and the buyer's inspector flagged the shower pan.

Solution:

We inspect the pan, run a flood test, and document the results. If the pan fails, we rebuild it with a new membrane and provide the flood-test photos for your records.

Outcome:

A documented, tested shower pan that satisfies the buyer and keeps your sale on track.

Tools and Methods We Use

Tools & Equipment

Moisture Meter

Used during demo and inspection to find hidden moisture in framing and subfloor before we rebuild. It tells us exactly how far water damage has spread.

Schluter Kerdi Sheet Membrane

A bonded waterproofing membrane applied over cement backer board. Uniform thickness, no pinholes, and it bonds directly to the substrate with thinset.

Cement Backer Board

The substrate for tile in wet areas. Unlike greenboard or drywall, it does not break down when exposed to moisture, and it gives the membrane a stable surface.

PVC Drain Pipe and PEX Piping

Used for drain and supply connections in the shower. We set the drain height for the tile and coordinate any PEX changes with our licensed plumber.

Wet Saw and Tile Spacers

Used during the tile phase to make clean cuts around niches, drains, and corners, and to keep grout lines consistent across the shower.

Silicone Caulk and Grout Float

Silicone caulk seals all changes of plane, corners, and fixture joints. The grout float is used to pack grout into the joints evenly after tile is set.

Exhaust Fan Duct and Broan or Panasonic Fan

Moves steam out of the bathroom to protect the waterproofing and keep indoor humidity under control. Sized to the room volume and ducted to the exterior.

Methods

TCNA Shower Pan Standards

We build every shower pan to the Tile Council of North America handbook, including the 1/4-inch-per-foot slope to the drain, proper curb height, and membrane detailing at all transitions. This is the industry standard that inspectors and manufacturers recognize.

24-Hour Flood Test

After the membrane is installed and cured, we fill the pan with water and let it sit for a full 24 hours. If the water level drops, we find the leak and fix it before tile. This is the single most important quality check in the process.

Bonded Sheet Membrane Application

We bond Schluter Kerdi membrane to cement backer board with unmodified thinset, overlapping seams by 2 inches and banding every corner and penetration. This creates a continuous waterproof layer with no gaps.

Liquid-Applied Membrane System

For some showers, we roll on a liquid-applied membrane in two or more coats to the manufacturer's specified thickness. We use a wet-film gauge to confirm coverage and reinforce corners with membrane fabric.

IRC and IBC Code Compliance

All plumbing and structural work follows the International Residential Code and International Building Code as adopted by the City of Georgetown. We pull permits when required and coordinate inspections so your project passes the first time.

How Waterproofing Works in Georgetown Homes

Georgetown sits on expansive clay soil, and that matters for waterproofing more than most homeowners realize. When the soil shifts with wet and dry seasons, it moves foundations, and that movement transfers into the framing of your house. A shower pan that was perfectly flat when it was built can develop hairline cracks in the mortar bed after a few years of foundation movement. That is why we build pans with a membrane that can handle minor movement, and why we flood-test every job. The other local factor is humidity. Georgetown summers push indoor humidity past 60 percent, and a bathroom with an undersized exhaust fan will stay damp long after the shower is off. We size the fan to the room and duct it outside, which protects the waterproofing from the inside. Older homes in Old Town Georgetown and San Gabriel Heights often have original cast iron drains and greenboard walls, both of which need to be replaced during a waterproofing project. Newer builds in Wolf Ranch and Parkside on the River usually have PVC drains and cement board already, but the membrane is often missing or applied too thin. If you are looking for bathroom waterproofing in Serenada Georgetown TX or anywhere in Williamson County, we bring the same materials and the same flood-test standard to every job, whether it is a 1950s bungalow or a 2020s new build.

Service Areas

Sun City Georgetown

Many homes here were built between 2000 and 2015, and original shower pans are now hitting the end of their lifespan. We see a lot of failed pans and cracked tile in this neighborhood.

Old Town Georgetown

Older homes often have cast iron drains, greenboard walls, and original framing that has been exposed to moisture for decades. Waterproofing here usually means a full rebuild.

Wolf Ranch

Newer construction with PVC drains and cement board, but the membrane is sometimes missing or too thin. We upgrade these showers to a full bonded membrane system.

Berry Creek

Larger homes with multiple bathrooms. We often waterproof two or three showers in one visit, which saves on mobilization and keeps the project on one schedule.

Parkside on the River

New builds where homeowners want to upgrade the builder-grade shower before move-in. We waterproof and tile before the family ever uses the bathroom.

Local Considerations

Expansive clay soil and seasonal foundation movement

Foundation movement can crack mortar beds and stress membranes over time. We use flexible membrane systems and flood-test to catch any movement-related failures early.

High summer humidity above 60 percent

Humidity slows drying and stresses waterproofing from the inside. We size exhaust fans correctly and duct them outside to keep the bathroom dry.

Older homes with cast iron drains and greenboard

Cast iron corrodes and greenboard breaks down when wet. We replace both during waterproofing so the new system starts with sound materials.

Newer builds with missing or thin membranes

Builder-grade showers often skip the membrane or apply it too thin. We upgrade to a full bonded sheet or liquid membrane system with proper thickness.

Sun City Shower Pan Rebuild

Before

A 2007 Sun City Georgetown shower had been leaking into the closet for at least a year. The pan was cracked, the backer board was soft, and two studs had rot. The homeowner had no idea until the closet started smelling musty.

After

We rebuilt the pan with a proper slope, replaced the rotted studs and subfloor, installed a Schluter Kerdi membrane, and flood-tested for 24 hours. New porcelain tile and a sealed curb finished the job. Total project time was nine working days.

Maintenance & Follow-up

Squeegee the walls after each shower and run the exhaust fan for 15 minutes. Re-caulk the curb and corners every two to three years with silicone caulk.

Before

A 1998 Berry Creek home had a standard tub with a failing surround. Water had been seeping behind the tile for years, and the drywall behind the tub was crumbling. The homeowner wanted a walk-in shower instead of a replacement tub.

After

We removed the tub, built a sloped shower pan, waterproofed the walls and floor with a liquid-applied membrane, flood-tested, and tiled with large-format porcelain. The new shower added usable space and eliminated the leak. Project took eleven working days.

Maintenance & Follow-up

Clean with a pH-neutral tile cleaner, not acidic. Check the drain screen monthly and remove hair to keep water flowing freely.

Before

A 1950s Old Town Georgetown bungalow had visible mold in the guest bathroom. The original shower had greenboard walls and a mastic coating, both of which had failed. The framing behind the wall was damp and discolored.

After

We removed the affected materials, treated the framing, replaced the cast iron drain with PVC, and rebuilt the shower with cement backer board and a bonded sheet membrane. Flood test passed on the first try. New tile and a new exhaust fan completed the job in twelve working days.

Maintenance & Follow-up

Keep the exhaust fan on a timer for 20 minutes after showers. Inspect grout lines every six months and re-seal any that show cracking or discoloration.

Frequently Asked Questions About Bathroom Waterproofing

Have questions? We have answers.

Call Us
How much does bathroom waterproofing cost in Georgetown TX?

Most shower waterproofing jobs in Georgetown run $850 to $2,400 in 2026, depending on shower size, membrane type, and whether we are rebuilding the pan. A simple tub surround starts around $650. Full wet-room waterproofing with a custom pan, bench, and niche can reach $3,500. The membrane itself is a small fraction of the cost; the labor to prep, slope, and flood-test is what you are paying for, and it is what prevents a $6,000 water damage repair later.

What is the best waterproofing for a Georgetown TX shower?

Bonded sheet membranes like Schluter Kerdi and liquid-applied membranes both perform well when installed to spec. For Georgetown's humidity and temperature swings, we usually recommend a sheet membrane over cement backer board because it is uniform in thickness and less prone to pinholes. The best system is the one installed correctly with proper banding at corners and a 24-hour flood test. We will walk you through the options for your specific shower during the estimate.

How long does bathroom waterproofing take in Georgetown Texas?

Waterproofing alone takes two to four days for a standard shower: one day for prep and backer board, one day for membrane, and one full day for the flood test. If we are also setting tile, add four to six more days. A complete tub-to-shower conversion with waterproofing typically runs seven to twelve working days from demo to final seal. We give you a written schedule before we start so you know when your bathroom will be usable again.

Do I need a permit for bathroom waterproofing in Georgetown TX?

Waterproofing itself usually does not require a separate permit, but any plumbing changes, drain relocation, or electrical work for a new exhaust fan does. The City of Georgetown requires permits for plumbing alterations and inspections for the rough-in. We handle the permit paperwork and coordinate inspections so you are not chasing the city. If your project is waterproofing only with no plumbing changes, we typically proceed without a permit.

Licensed, Certified, and Accountable

Certifications

TDLR Contractor License by Texas Department of Licensing and Regulation
EPA Lead-Safe Certification by U.S. Environmental Protection Agency
Texas State Board of Plumbing Examiners License by Texas State Board of Plumbing Examiners
OSHA 30 Safety Certification by Occupational Safety and Health Administration
NARI Certification by National Association of the Remodeling Industry

Reviews

Google

Georgetown Bath Remodel Pros waterproofed our shower during a full bathroom remodel. They flood-tested it and sent us photos, which no other contractor even mentioned. The shower has been in for over a year with zero issues. Highly recommend for anyone in Georgetown.

Yelp

We had a leak from the upstairs shower into our kitchen ceiling. They found the failed pan, rebuilt it with a proper membrane, and fixed the ceiling. Clean work, fair price, and they explained everything. Took about ten days total.

BBB

Professional from start to finish. They pulled the permit, coordinated the plumbing inspection, and kept us updated daily. The new shower is beautiful and we know it is waterproofed correctly. Worth the investment.

Google

We used them for a tub-to-shower conversion in Sun City. They found rot behind the old tub that two other contractors missed. Fixed it, waterproofed everything, and tiled it beautifully. Honest and thorough.

Related Services

Full Bathroom Remodeling

A full bathroom remodel in Georgetown almost always includes waterproofing as the first phase. We tear out the old shower, rebuild the pan and walls with a proper membrane, then finish with new tile, vanity, and fixtures. Waterproofing done at this stage is far cheaper than retrofitting it later.

Full Bathroom Remodeling

Bathroom Renovation

Renovation work often exposes hidden water damage behind old tile. We waterproof every wet area during the renovation so the new finishes stay dry. If you are updating a 1990s Georgetown bathroom, this is the moment to get the membrane right.

Bathroom Renovation

Shower Remodeling

Shower remodeling and waterproofing go hand in hand. We build the sloped pan, set cement backer board, apply the membrane, flood-test it, then set your new tile. Every shower remodel we do in Georgetown includes a full waterproofing system, not just a painted-on sealer.

Shower Remodeling

Bathtub Remodeling

Bathtub remodeling involves the same wet-area risks as a shower. We waterproof the tub surround and the floor around the tub before new tile goes up, so splashes and overflow do not rot the framing underneath.

Bathtub Remodeling

Walk-In Tub Installation

Walk-in tubs hold more water and create more splash than a standard tub. We waterproof the surround and floor before installation, and we make sure the door seal and drain connections are set into a properly protected wet area.

Walk-In Tub Installation

Tile Installation

Tile installation only lasts as long as what is under it. We set ceramic and porcelain tile over a fully waterproofed substrate, using a wet saw for clean cuts and silicone caulk at all changes of plane. No membrane, no warranty on the tile.

Tile Installation

Vanity Installation

Vanity installation can expose wall cavities behind the cabinet. If we find moisture damage during removal, we repair and waterproof that zone before setting the new vanity cabinet, so a small leak does not become a big repair.

Vanity Installation

Bathroom Flooring Installation

Bathroom flooring installation in Georgetown benefits from waterproofing at the perimeter and around the toilet flange. We seal those transitions so spills and slow leaks stay on top of the floor instead of soaking into the subfloor.

Bathroom Flooring Installation

Bathroom Countertop Installation

Bathroom countertop installation involves cutting for sinks and faucets, which creates openings water can find. We seal the countertop-to-wall joint and the sink cutout edges with silicone caulk as part of a complete wet-area protection plan.

Bathroom Countertop Installation

Toilet Installation

Toilet installation is a common source of slow leaks at the wax ring and flange. When we set a new toilet, we inspect the subfloor around the flange for water damage and repair it before installation, so the new fixture sits on solid, dry material.

Toilet Installation

Sink Installation

Sink installation involves supply lines and drain connections inside the vanity. We check for leaks after installation and seal the sink-to-counter joint with silicone caulk, which prevents water from seeping into the cabinet and subfloor over time.

Sink Installation

Faucet Installation

Faucet installation is where small drips start. A leaking faucet or a loose supply connection can send water into the wall for months before you notice. We pressure-test every faucet we install and check the connections before we close up the wall.

Faucet Installation

Shower Door Installation

Shower door installation requires precise alignment with the curb and walls, which is only possible if the shower was built square and waterproofed correctly. We install shower glass after the membrane and tile are complete, and we seal the frame with silicone caulk.

Shower Door Installation

Bathtub-to-Shower Conversion

A bathtub-to-shower conversion is the most common project where waterproofing matters most. We remove the tub, build a sloped shower pan, waterproof the walls and floor, flood-test, then tile. This conversion adds usable space and a properly sealed wet area in one project.

Bathtub-to-Shower Conversion

Accessible Bathroom Remodeling

Accessible bathroom remodeling often means a curbless or low-curb shower, which requires more aggressive waterproofing because water has more ways to escape. We build those pans to ADA-compliant slopes and waterproof the entire wet zone, including the transition to the main floor.

Accessible Bathroom Remodeling

Bathroom Cabinets and Storage

Bathroom cabinets and storage sit against walls that can hide moisture. If we find water damage behind old cabinets during removal, we repair and waterproof that area before installing new cabinetry, so your storage stays dry and mold-free.

Bathroom Cabinets and Storage

Bathroom Ventilation and Exhaust Fan Installation

Bathroom ventilation and exhaust fan installation directly affects how well your waterproofing performs. An exhaust fan that does not remove steam lets humidity build up and stress the membrane. We size and duct the fan correctly so moisture leaves the room instead of condensing on your walls.

Bathroom Ventilation and Exhaust Fan Installation

Bathroom Drywall and Painting

Bathroom drywall and painting come after waterproofing is complete and tested. We use moisture-resistant drywall in the non-wet areas and finish with paint that stands up to humidity, so the whole room, not just the shower, resists Georgetown's damp summers.

Bathroom Drywall and Painting

What Georgetown Homeowners Say

Real experiences from customers who chose our Bathroom Waterproofing services

"Our 2006 shower had been leaking into the closet for who knows how long. Georgetown Bath Remodel Pros tore it out, showed us the rotted studs, and rebuilt the whole pan with a Schluter membrane. They flood-tested it for a full day and sent us photos. Six months later, no moisture, no smell, no stains. Worth every penny."
K

Karen M.

Homeowner, Sun City Georgetown

"We got three quotes for a tub-to-shower conversion. Two of them never mentioned waterproofing at all. These guys explained the membrane, the pan slope, and the flood test before we even signed. The shower has been in for a year and the grout still looks new. They know what they are doing."
D

David R.

Homeowner, Berry Creek

"We had mold behind the old tile and were worried it was everywhere. The crew found the source, a failed pan in the guest bath, fixed the framing, and waterproofed both bathrooms. They were clean, on schedule, and walked us through every step. I have already recommended them to two neighbors."
P

Priya S.

Homeowner, Wolf Ranch

Get Your Bathroom Waterproofing Georgetown TX Quote

We have been waterproofing Georgetown bathrooms since 2013, and every job gets a 24-hour flood test and photo documentation. Call 512 325 0295 or request an estimate online. We will walk your bathroom, explain the membrane options, and give you a written price before any work starts.